• Steel Fixing at Ambarau Hydro Power Intake

       

       Steel fixing for Kibali Ambarau hydroelectric plant dam wall.

       

   Sheeting and steel erection works for Kibali underground mechanical and electrical workshops.

  • Casting of Concrete Slabs for Sample Placement

     

    Slabs casted for placing samples from Kibali MRM Department.

  • Installation of General Arkn Pump Pipe Project at Met Plant/ Engineering

        

  •        The ARKN pump pipe Project and structure wich is stalled at Kibali Met Plant.

         Roof sheet installation at Power house structure for azambi hydro-electric plant Kibali

  •      Fabrication and Installation of Pump Support Structure At GURUMBUA -KIBALIGOLD SITE

       

      The pump support structure that is to be installed at Kibali open pit.

The pump support structure that is installed at Kibali open pit is used to drain water from underground.

  •     Fabrication and Installtion of the SILO Tank Project

   

  •   Installation of crusher support structure and chutes                                

    

 The crusher support structure and chutes that are installed at Kibali                      

underground section which are fed by the conveyor CV003.

  • Installation of Sampling Plant  

Sampling plant installed at Kibali conveyor CV142

 

 

  • Construction of KUKUNDEKU Bridge at Durba (Road N 26)

It is a civil engineering work, of which the reinforced concrete constitutes the structure. This bridge is thrown on the KUKUNDEKU River on the road connecting the mining town of Durba to the chief town of the Watsa territory. We built retaining walls with veil on either side of the river and a pillar in the middle.

 

 

  • Fabrication and Installation of the Azambi Bridge – KibaliGold Mine

Installation of a pedestrian bridge which is installed across Kibali River

for the local community members to use and is located at Azambi hydroelectric plant.

  • Installation and Fabrication of Stop Log and Pit roller gates at Intake Structure Azambi

 Installation and fabrication of stop log and roller gate frames at Azambi Hydro Power Plant Intake which is used to control the quantity of water at the power canal.

ONSITE QUALITY

As a specialist steel fabricator, we understand the value of local knowledge and manufacturing onsite, providing significant savings; of giving our clients options as to how they’d like to go about their projects, the accessibility of our founder to make things happen; the tested quality of our team, providing a solid platform.

Our Staff

Oscar Siviwe
 Director
This email address is being protected from spambots. You need JavaScript enabled to view it.
 Cornelis Blom
Managing Director
This email address is being protected from spambots. You need JavaScript enabled to view it.
Serge Kyalima
Senior manager
This email address is being protected from spambots. You need JavaScript enabled to view it.
 

Video

Silo Project Pedestrian Bridge