• Construction of KUKUNDEKU Bridge at Durba (Road N 26)

It is a civil engineering work, of which the reinforced concrete constitutes the structure. This bridge is thrown on the KUKUNDEKU River on the road connecting the mining town of Durba to the chief town of the Watsa territory. We built retaining walls with veil on either side of the river and a pillar in the middle.

 

 

  • Fabrication and Installation of the Azambi Bridge – KibaliGold Mine

Installation of a pedestrian bridge which is installed across Kibali River

for the local community members to use and is located at Azambi hydroelectric plant.

  • Installation and Fabrication of Stop Log and Pit roller gates at Intake Structure Azambi

 Installation and fabrication of stop log and roller gate frames at Azambi Hydro Power Plant Intake which is used to control the quantity of water at the power canal.